At this school in Wellingborough we installed a two layer hot melt, felt system onto the existing asphalt roof space. Incorporating tapered sections surrounding the rooflights for water run-off, which were previously areas of standing water, which had caused various leaks.
At the Wimbledon Beaumont community care home we carried out roof renewals across two seperate roofs, both roof build ups consisted of timber plus asphalt with embedded stone chippings which were de- scarified and cleared down to a flat surface. The roofs were then primed and felted with a two layer torch on system.
At Fenn Holdings Ltd we provided various works across their multiple sites including industrial gutter clearing & coating, industrial roof fixings coating, torch on felt works & fascia, soffit & gutter installations.
©Copyright. All rights reserved.
We need your consent to load the translations
We use a third-party service to translate the website content that may collect data about your activity. Please review the details in the privacy policy and accept the service to view the translations.